
Head Mason Joe Alonso talks about repairs of the stonework at the Washington National Cathedral on scaffolding 65 feet above the nave floor. The Cathedral has finished the first phase of restoration work needed after an earthquake in 2011. (Associated Press photographs)
Featured Photo Galleries











